Deep Artesian Well
Access to sustainable groundwater infrastructure remains a significant challenge in certain rural areas of Indonesia. Limited water systems affect daily household use, agriculture, and overall community stability.
The 40-meter deep artesian well project is designed to provide a long-term, high-capacity groundwater solution. The well is drilled to approximately 40 meters to access deeper aquifers and is equipped with:
- An electric pump system
- A 500-liter elevated storage tank
- Protective structural finishing
This system is designed to supply clean water for more than 100 individuals daily, supporting drinking, cooking, sanitation, and small-scale agricultural needs. With proper maintenance, the estimated operational lifespan ranges between 15 to 20 years.
Project Scope & Implementation
Upon project confirmation, our team coordinates:
- Hydrogeological assessment and site verification
- Deep drilling operations (approx. 40 meters)
- Installation of pumping and storage systems
- Structural protection and finishing works
- Final inspection and operational testing
The estimated execution period is approximately 45–60 days, depending on site and logistical conditions.
Reporting & Documentation
Upon completion, the client receives:
- A detailed project completion report
- Photo and video documentation of drilling and installation
- GPS coordinates of the well location
- Project identification marking (if requested)
All documentation is delivered digitally to ensure transparency and verified project execution.